A Visit to Toyota Texas Plant in San Antonio Texas and Lessons Learned for Construction

On November 19th, 2010, I got a chance to visit Toyota Texas Plant. It was truly a great experience. One because it was a Truck Manufacturing Plant and second because I got to see Toyota Production System (TPS) in action. Toyota is where the concept of 'lean' was first born in 1930's. This visit was very significant for me as I was reading about lean in manufacturing throughout my masters at Texas A&M and this was a time to see how things actually get done at Toyota plants.

We were very well received by the plant management at the Visitors' Center and taken to the assembly lines later after a short presentation on Toyota Texas and TPS. This plant started manufacturing trucks (thats what Texans like the most) called "Tundra" and "Tacoma" in year 2006. Both trucks are manufactured on the same assembly line with the help of automatic changing dies (that typically take 5 min on avg) and about 400 robots. The plant works in 2 shifts and produce around 860 vehicles every day.

I got to see the Toyota truck production first hand and as I mentioned earlier it was amazing. The tour guide was a very kind lady who knew the in and out of the plant and showed us around with every possible detail she could in 45 min duration. However, I couldn't stop my mind by comparing lean in manufacturing and lean in construction throughout those 45 minutes.

One very interesting thought revolving in my mind was "how much revenue Toyota is making every day by selling the trucks manufactured on this plant?" After a few searches on Google, I was able to find out that Tundra costs around $24,000 and Tacoma around $20,000. The simple math tells us that on an average Toyota Texas plant is producing trucks worth $19,000,000 every day (assuming equal number of both models). In contrast a $19,000,000 construction project may take anywhere between 1 to 2 years. Obviously, it could be argued that the upfront plant construction costs, technologies used and number of people working in the Toyota plant are way more than what is done on a construction site. However, we can learn a lot from manufacturing, the difference is too big to compare and the concept of reducing the time and cost with improved quality can be taken to a whole new level once this difference is apparent to everybody on the construction team.

In my opinion every team member from a construction project should visit a manufacturing plant once with an aim in mind to learn from the means and methods used there. It may not be possible for everybody to visit the Toyota Plant but a good manufacturing plant itself will be a great source of learning and motivation.

Comments

  1. Please read Hal's thoughts on Toyota Production System - http://www.reformingprojectmanagement.com/2010/02/10/1060/

    He also tries to emphasize the importance of 'planning in detail as you get near execution' thats the core of Last Planner System too.

    ReplyDelete
  2. A relevant article by Matt Horvat of Lean Project Consulting - http://bit.ly/gT8bQm

    ReplyDelete

Post a Comment

Popular posts from this blog

World's Tallest Building Sky City-1 Changsha China and BIM, Lean and Green - What might be coming?

I feel fortunate to be living in an era when there are Computers, iPhones, iPads, Androids, Google Glasses, Google Earth, Facebook, Twitter and Broad Sustainable Construction. All but the last one out of my list are pretty obvious and I do not feel explaining why they are awesome.   However, I feel like talking a lot about Broad Sustainable Construction, a company which is based out of China and doing miracle after miracle and revolutionizing what world calls development. As a matter of fact, China is doing great with several other things too. But this blog won’t be talking about that. At this very moment (January 5 th 2013) Broad Sustainable Construction is building world’s tallest building – Sky City –1, which is almost a kilometer high (838 m/2749 ft to be precise) with 220 floors. They are set to complete the construction of this building within 90 days. This is remarkable and revolutionary. They claim to prefabricate 95% of building off site. Guess what, whole world is tryin

Leading by example- Ark Hotel Construction shows How Prefabrication can Change the Face of Construction Industry

This video titled "Ark Hotel Construction time lapse building 15 storeys in 2 days" surfaced only last month on the internet and it was seen more than 3.8 million times on Youtube alone. And there is a reason for that. It took just six days to build the Ark Hotel in Changsha, China. According to the video, no stationary cranes were used in construction and there wasn't single injury among the site's workers. The 15-story sustainable hotel already had its foundation but using pre-fabricated columns and modules as well as modern construction techniques, construction workers took just 46 hours to finish the main structural components and another 90 hours to finish the building enclosure. Construction Details: Level 9 Earthquake Resistance: diagonal bracing structure, light weight, steel construction, passed level 9 earthquake resistance testing 6x Less Material : even though the construction materials are much lighter(250kg/m2) than the traditional materials(over 1500kg/

Integrated Project Delivery (IPD) Contract and Legal Concerns

Stephen A. Hilger discussed the legal merits of Integrated Project Delivery ( IPD ) contract in ENR article " The Legal Worries Raised by IPD ." His major concerns involve: 1. Design and Financial Risk 2. Loss of the Spearin Doctrine 3. Sharing in Means and Methods 4. Losing the Economic Loss Doctrine 5. "Fluff" Language 6. Third Party Design Liabilities 7. IPD Team Members Can't be Sued and 8. Impact on Indemnity Clauses