Skip to main content

Posts

Showing posts from 2013

Data Driven Design and Construction - Answers to Randy's questions

Randy started a new blog  that will focus on Data Driven Design and Construction. He asked few questions in his first post. Here is my take, feel free to comment. I recommend you should follow his blog. He will be coming up with a book on this topic next year some time. I can't wait to read it. Here are his  questions  and my answers -  How do we, as a discipline, capitalize on data and metadata to drive innovation in architecture and construction, just as other disciplines and industries have? Evidence based design is one of the leading fields of research that will eventually result in data driven design and construction. Understanding the end user requirements better and designing products that reach to the highest level of customer satisfaction would require data driven design. On technology front, building information  modelling  (BIM), virtual reality and augmented reality will help collect the data related to customer requirement. Moreover, when constructi

World's Tallest Building Sky City-1 Changsha China and BIM, Lean and Green - What might be coming?

I feel fortunate to be living in an era when there are Computers, iPhones, iPads, Androids, Google Glasses, Google Earth, Facebook, Twitter and Broad Sustainable Construction. All but the last one out of my list are pretty obvious and I do not feel explaining why they are awesome.   However, I feel like talking a lot about Broad Sustainable Construction, a company which is based out of China and doing miracle after miracle and revolutionizing what world calls development. As a matter of fact, China is doing great with several other things too. But this blog won’t be talking about that. At this very moment (January 5 th 2013) Broad Sustainable Construction is building world’s tallest building – Sky City –1, which is almost a kilometer high (838 m/2749 ft to be precise) with 220 floors. They are set to complete the construction of this building within 90 days. This is remarkable and revolutionary. They claim to prefabricate 95% of building off site. Guess what, whole world is tryin