Skip to main content

Reed Construction Data Launches SmartBIM

(source)

Video


ATLANTA -- Reed Construction Data, a leading provider of construction information, has launched SmartBIM solutions for the architecture, engineering and construction communities. This first phase of SmartBIM will include SmartBIM Library™, SmartBIM Objects™ and RSMeans™ Quick Cost Estimator.

With the launch of SmartBIM, Reed Construction Data seeks to further enhance the Autodesk™ Revit™ user experience through its comprehensive object-organization solution (SmartBIM Library) while providing high-quality, parametric BIM objects (SmartBIM Objects) and enhanced ability to value a project (RSMeans Quick Cost Estimator).

"We are taking 3D design to the next level by combining high-quality objects and powerful software tools with RSMeans Cost Data," said Iain Melville, CEO, Reed Construction Data. "The movement into 3D design has led to a number of advancements, including greater design and change-order flexibility, enhanced project delivery through better collaboration, and more cost-efficient and safer designs. SmartBIM addresses the challenges and opportunities that this new technology presents."

Reed Construction Data's SmartBIM Library is a companion product to Autodesk Revit that enhances content management by allowing design firms to organize, manage and locate BIM content more easily and intuitively. It also allows users to generate libraries from data and objects that they currently use, and drag and drop objects directly into Revit models. In addition, SmartBIM objects will be able to link directly to RSMeans data for costing and other analyses.

Reed Construction Data is also offering SmartBIM Objects for Building Product Manufacturers (BPMs). SmartBIM Objects are high-quality objects designed to simulate the actual product and embed critical product data and specifications in the Revit model.

"Building Product Manufacturers can leverage BIM to showcase their products in a building in the design phase if they have high-quality objects in the hands of the architect," said Richard Remington, vice president, product development, Reed Construction Data. "The SmartBIM object-creation program provides BPMs with high-quality BIM objects that can be distributed through many channels to end users, which increases the opportunity to be specified into the building."
Reed Construction Data is also offering the RSMeans Quick Cost Estimator within Revit to instantly calculate the estimated value of a project specific to its location. RSMeans data will be integrated with all SmartBIM applications and will offer unique data for its users' models.

Comments

Popular posts from this blog

World's Tallest Building Sky City-1 Changsha China and BIM, Lean and Green - What might be coming?

I feel fortunate to be living in an era when there are Computers, iPhones, iPads, Androids, Google Glasses, Google Earth, Facebook, Twitter and Broad Sustainable Construction. All but the last one out of my list are pretty obvious and I do not feel explaining why they are awesome.   However, I feel like talking a lot about Broad Sustainable Construction, a company which is based out of China and doing miracle after miracle and revolutionizing what world calls development. As a matter of fact, China is doing great with several other things too. But this blog won’t be talking about that. At this very moment (January 5 th 2013) Broad Sustainable Construction is building world’s tallest building – Sky City –1, which is almost a kilometer high (838 m/2749 ft to be precise) with 220 floors. They are set to complete the construction of this building within 90 days. This is remarkable and revolutionary. They claim to prefabricate 95% of building off site. Guess what, whole world is tryin

Leading by example- Ark Hotel Construction shows How Prefabrication can Change the Face of Construction Industry

This video titled "Ark Hotel Construction time lapse building 15 storeys in 2 days" surfaced only last month on the internet and it was seen more than 3.8 million times on Youtube alone. And there is a reason for that. It took just six days to build the Ark Hotel in Changsha, China. According to the video, no stationary cranes were used in construction and there wasn't single injury among the site's workers. The 15-story sustainable hotel already had its foundation but using pre-fabricated columns and modules as well as modern construction techniques, construction workers took just 46 hours to finish the main structural components and another 90 hours to finish the building enclosure. Construction Details: Level 9 Earthquake Resistance: diagonal bracing structure, light weight, steel construction, passed level 9 earthquake resistance testing 6x Less Material : even though the construction materials are much lighter(250kg/m2) than the traditional materials(over 1500kg/

Integrated Project Delivery (IPD) Contract and Legal Concerns

Stephen A. Hilger discussed the legal merits of Integrated Project Delivery ( IPD ) contract in ENR article " The Legal Worries Raised by IPD ." His major concerns involve: 1. Design and Financial Risk 2. Loss of the Spearin Doctrine 3. Sharing in Means and Methods 4. Losing the Economic Loss Doctrine 5. "Fluff" Language 6. Third Party Design Liabilities 7. IPD Team Members Can't be Sued and 8. Impact on Indemnity Clauses